Application of neural networks and neuro-fuzzy models in construction scheduling

Applications of AI


  • Chan, A. P. C. & Chan, D. W. M. Developing a benchmark model for project construction time performance in Hong Kong. Build. Environ. 39(3), 339–349 (2004).

    Article 

    Google Scholar 

  • Ujong, J. A., Mbadike, E. M. & Alaneme, G. U. Prediction of cost and duration of building construction using artificial neural network. Asian J. Civ. Eng. https://doi.org/10.1007/s42107-022-00474-4 (2022).

    Article 

    Google Scholar 

  • Homaei, F. & Najafzadeh, M. A reliability-based probabilistic evaluation of the wave-induced scour depth around marine structure piles. Ocean Eng. 196, 106818. https://doi.org/10.1016/j.oceaneng.2019.106818 (2020).

    Article 

    Google Scholar 

  • Elhegazy, H., Badra, N., AboulHaggag, S. & Abdel Rashid, I. Implementation of the neural networks for improving the project’s performance of steel structures projects. J. Ind. Integr. Manag. 7(1), 133–152. https://doi.org/10.1142/S2424862221500251 (2022).

    Article 

    Google Scholar 

  • Iranmanesh, S. H. & Zarezadeh, M. Application of artificial neural network to forecast actual cost of a project to improve earned value management system. World Academy of Science, Engineering and Technology, pp. 210–213 (2008).

  • Onyelowe, K. C. et al. Artificial intelligence prediction model for swelling potential of soil and quicklime activated rice husk ash blend for sustainable construction. Jurnal Kejuruteraan 33(4), 845–852. https://doi.org/10.17576/jkukm-2021-33(4)-07 (2021).

  • Zhang, J. & Haghighat, F. Development of Artificial Neural Network based heat convection algorithm for thermal simulation of large rectangular cross-sectional area Earth-to-Air Heat Exchangers. Energy Build. 42(4), 435–440 (2010).

    Article 

    Google Scholar 

  • Najafzadeh, M. & Oliveto, G. Exploring 3D wave-induced scouring patterns around subsea pipelines with artificial intelligence techniques. Appl. Sci. 11, 3792. https://doi.org/10.3390/app11093792 (2021).

    Article 
    CAS 

    Google Scholar 

  • Alaneme George, U. & Mbadike Elvis, M. Modelling of the mechanical properties of concrete with cement ratio partially replaced by aluminium waste and sawdust ash using artificial neural network. SN Appl. Sci. 1, 1514. https://doi.org/10.1007/s42452-019-1504-2 (2019).

    Article 
    CAS 

    Google Scholar 

  • Alimoradi, A., Pezeshk, S. & Naeim, F. Identification of input ground motion records for seismic design using neuro-fuzzy pattern recognition and genetic algorithms. ASCE Structures Congress, pp. 1–12. https://doi.org/10.1061/40700(2004)161 (2004).

  • Alaneme, G. U., Mbadike, E. M., Attah, I. C. & Udousoro, I. M. Mechanical behaviour optimization of saw dust ash and quarry dust concrete using adaptive neuro-fuzzy inference system. Innov. Infrastruct. Solut. 7, 122. https://doi.org/10.1007/s41062-021-00713-8 (2022).

    Article 

    Google Scholar 

  • Afradi, A. & Ebrahimabadi, A. Prediction of TBM penetration rate using the imperialist competitive algorithm (ICA) and quantum fuzzy logic. Innov. Infrastruct. Solut. 6, 103. https://doi.org/10.1007/s41062-021-00467-3 (2021).

    Article 

    Google Scholar 

  • Alaneme, G. U., Dimonyeka, M. U., Ezeokpube, G. C., Uzoma, I. I. & Udousoro, I. M. Failure assessment of dysfunctional flexible pavement drainage facility using fuzzy analytical hierarchical process. Innov. Infrastruct. Solut. https://doi.org/10.1007/s41062-021-00487-z (2021).

    Article 

    Google Scholar 

  • Tokede, O., Ahiaga-Dagbui, D., Smith, S. & Wamuziri, S. Mapping relational efficiency in neuro-fuzzy hybrid cost models. ASCE Construction Research Congress, pp. 1458–1467. https://doi.org/10.1061/9780784413517.149 (2014).

  • Wang, W.-C., Bilozerov, T., Dzeng, R.-J., Hsiao, F.-Y. & Wang, K.-C. Conceptual cost estimations using neuro-fuzzy and multi-factor evaluation methods for building projects. J. Civ. Eng. Manag. 23(1), 1–14 (2017).

    Article 

    Google Scholar 

  • Najafzadeh, M. & Saberi-Movahed, F. GMDH-GEP to predict free span expansion rates below pipelines under waves. Mar. Georesour. Geotechnol. https://doi.org/10.1080/1064119X.2018.1443355 (2018).

    Article 

    Google Scholar 

  • Uwanuakwa, I. D., Idoko, J. B., Mbadike, E., Resatoglu, R. & Alaneme, G. Application of deep learning in structural health management of concrete structures. Proc. Inst. Civ. Eng. Bridge Eng. https://doi.org/10.1680/jbren.21.00063 (2022).

    Article 

    Google Scholar 

  • Elhegazy, A. H. et al. Artificial intelligence for developing accurate preliminary cost estimates for composite flooring systems of multi-storey buildings. J. Asian Archit. Build. Eng. 21(1), 120–132. https://doi.org/10.1080/13467581.2020.1838288 (2022).

    Article 

    Google Scholar 

  • Najafzadeh, M., Movahed, F. S. & Sarkamaryan, S. NF-GMDH based self-organized systems to predict bridge pier scour depth under debris flow effects. Mar. Georesour. Geotechnol. https://doi.org/10.1080/1064119X.2017.1355944 (2017).

    Article 

    Google Scholar 

  • Shihabudheen, K. V., Mahesh, M. & Pillai, G. N. Particle swarm optimization based extreme learning neuro-fuzzy system for regression and classification. Expert Syst. Appl. 92, 474–484. https://doi.org/10.1016/j.eswa.2017.09.037 (2018).

    Article 

    Google Scholar 

  • Agor, C. D., Mbadike, E. M. & Alaneme, G. U. Evaluation of sisal fiber and aluminum waste concrete blend for sustainable construction using adaptive neuro-fuzzy inference system. Sci. Rep. 13, 2814. https://doi.org/10.1038/s41598-023-30008-0 (2023).

    Article 
    ADS 
    CAS 
    PubMed 
    PubMed Central 

    Google Scholar 

  • Catalão, J., Osório, G. & Pousinho, H. M. I. Hybrid wavelet-PSO-ANFIS approach for short-term electricity prices forecasting. IEEE Trans. Power Syst. 26(1), 137–144. https://doi.org/10.1109/TPWRS.2010.2049385 (2011).

    Article 
    ADS 

    Google Scholar 

  • Cpalka, K., Lapa, K., Przybyl, A. & Zalasinski, M. A new method for designing neurofuzzy systems for nonlinear modelling with interpretability aspects. Neurocomputing 135, 203–217. https://doi.org/10.1016/j.neucom.2013.12.031 (2014).

    Article 

    Google Scholar 

  • Elmousalami, H. H. Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. J. Constr. Eng. Manag. 146(1), 03119008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001678 (2020).

    Article 

    Google Scholar 

  • Georgy, M. E., Chang, L.-M. & Zhang, L. Prediction of engineering performance: A neurofuzzy approach. J. Constr. Eng. Manag. 131(5), 548–557. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:5(548) (2005).

    Article 

    Google Scholar 

  • Shahtaheri, M., Nasir, H. & Haas, C. T. Setting baseline rates for on-site work categories in the construction industry. J. Constr. Eng. Manag. 141(5), 04014097. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000959 (2015).

    Article 

    Google Scholar 

  • Rashidi, A., Jazebi, F. & Brilakis, I. Neurofuzzy genetic system for selection of construction project managers. J. Constr. Eng. Manag. 137(1), 17–29. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000200 (2011).

    Article 

    Google Scholar 

  • Shahhosseini, V. & Sebt, M. Competency-based selection and assignment of human resources to construction projects. Sci. Iran. 18(2), 163–180. https://doi.org/10.1016/j.scient.2011.03.026 (2011).

    Article 

    Google Scholar 

  • Mirahadi, F. & Zayed, T. Simulation-based construction productivity forecast using neural-network-driven fuzzy reasoning. Autom. Constr. 65, 102–115. https://doi.org/10.1016/j.autcon.2015.12.021 (2016).

    Article 

    Google Scholar 

  • Aziz, R. F., Hafez, S. M. & Abuel-Magd, Y. R. Smart optimization for mega construction projects using artificial intelligence. Alex. Eng. J. 53, 591–606 (2014).

    Article 

    Google Scholar 

  • Schelle, H., Ottmann, R. & Pfeiffer, A. Project Manager, GPM Deutsche Gesellschaft für Projektmanagement. Nürnberg, ISBN 9783800637362 (2005).

  • Al-Tabtabai, H., Kartam, N., Flood, I. & Alex, A. Expert judgment in forecasting construction project completion. Eng. Constr. Archit. Manag. 4(4), 271–293 (1997).

    Article 

    Google Scholar 

  • Ma, X. & Yang, B. Optimization study of Earned Value Method in construction project management. International Conference on Information Management, Innovation Management and Industrial Engineering (2012).

  • Jacob, D. & Kane, M. Forecasting schedule completion using earned value metrics? Revisited. The Measurable News 1, 11–17 (2004).

    Google Scholar 

  • Verma, A., Pathak, K. K. & Dixit, R. K. Earned value analysis of construction project at Rashtriya Sanskrit Sansthan, Bhopal. Int. J. Innov. Res. Sci. Eng. Technol. 3(4), 11350–11355 (2014).

    Google Scholar 

  • Batselier, J. & Vanhoucke, M. Empirical evaluation of earned value management forecasting accuracy for time and cost. J. Constr. Manag. 141(11), 05015010 (2015).

    Article 

    Google Scholar 

  • Zheng, X. & Liu, Z. The schedule control of engineering project based on particle swarm algorithm. In Proceedings of the 2nd International Conference on Communication Systems, Networks and Applications (ICCSNA ’10), pp. 184–187 (2010).

  • Cheng, M.-Y. & Roy, A. F. Evolutionary fuzzy decision model for construction management using support vector machine. Expert Syst. Appl. 37(8), 6061–6069 (2010).

    Article 

    Google Scholar 

  • Crawford, B. et al. Software project scheduling using the HyperCube ant colony optimization algorithm (2015).

  • Long, L. D. & Ohsato, A. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. Int. J. Project Manag. 26, 688–698 (2008).

    Article 

    Google Scholar 

  • Gunaydın, H. M. & Dogan, S. Z. A neural network approach for early cost estimation of structural systems of buildings. Int. J. Project Manag. 22, 595–602 (2004).

    Article 

    Google Scholar 

  • Sayed, T., Tavakolie, A. & Razavi, A. Comparison of adaptive network based fuzzy inference systems and B-spline neuro-fuzzy mode choice models. J. Comput. Civ. Eng. 17(2), 123–130. https://doi.org/10.1061/(ASCE)0887-3801(2003)17:2(123) (2003).

    Article 

    Google Scholar 

  • Zammori, F. A., Braglia, M. & Frosolini, M. A fuzzy multi-criteria approach for critical path definition. Int. J. Project Manag. 27, 278–291 (2009).

    Article 

    Google Scholar 

  • Kelley, J. E. & Walker, M. R. Critical path planning and scheduling. In Proceedings of the Eastern Joint Computer Conference, Boston, pp. 160–173 (1959).

  • Monjezi, N., Sheikhdavoodi, M. J., Basirzadeh, H. & Zakidizaji, H. Analysis and evaluation of mechanized greenhouse construction project using CPM methods. Res. Appl. Sci. Eng. Technol. 4(18), 3267–3273 (2012).

    Google Scholar 

  • Jun-jie, M. & Jian-xun, Q. Study on critical path method with fixed time parameter in network planning technology. Third International Symposium on Information Science and Engineering, 96 (2010).

  • Krystyna, A. Application of critical chain management in construction projects schedules in a multi-project environment: A case study. Procedia Eng. 182, 33–41 (2017).

    Article 

    Google Scholar 

  • Trietsch, D. & Baker, K. R. PERT 21: Fitting PERT/CPM for use in the 21st century. Int. J. Project Manag. 30, 490–502 (2012).

    Article 

    Google Scholar 

  • Nkiwane, N. H., Meyer, W. G. & Steyn, H. The use of earned value management for initiating directive project control decisions: A case study. South Afr. J. Ind. Eng. 27, 192–203 (2016).

    Google Scholar 

  • Vanhoucke, M. Measuring Time—Improving Project Performance using Earned Value Management, International Series in Operations Research and Management Science Vol. 136 (Springer, 2010).

    Google Scholar 

  • Maravas, A. & Pantouvakis, J. P. A fuzzy repetitive scheduling method for projects with repeating activities. J. Constr. Eng. Manag. 137, 561–564 (2011).

    Article 

    Google Scholar 

  • De Marco, A. & Narbaev, T. Earned value-based performance monitoring of facility construction projects. J. Facil. Manag. (2013).

  • Kim, E., Wells, W. G. Jr. & Duffey, M. R. A model for effective implementation of Earned Value Management methodology. Int. J. Project Manag. 21, 375–382 (2003).

    Article 

    Google Scholar 

  • Fleming, Q. & Koppelman, J. Earned Value Project Management 3rd edn. (Project Management Institute, 2005).

    Google Scholar 

  • Alaneme, G. U., Attah, I. C., Etim, R. K. & Dimonyeka, M. U. Mechanical properties optimization of soil—Cement kiln dust mixture using extreme vertex design. Int. J. Pavement Res. Technol. https://doi.org/10.1007/s42947-021-00048-8 (2021).

    Article 

    Google Scholar 

  • Alaneme, G. U., Mbadike, E. M., Iro, U. I., Udousoro, I. M. & Ifejimalu, W. C. Adaptive neuro-fuzzy inference system prediction model for the mechanical behavior of rice husk ash and periwinkle shell concrete blend for sustainable construction. Asian J. Civ. Eng. https://doi.org/10.1007/s42107-021-00357-0 (2021).

    Article 

    Google Scholar 

  • Obianyo, J. I., Okey, O. E. & Alaneme, G. U. Assessment of cost overrun factors in construction projects in Nigeria using fuzzy logic. Innov. Infrastruct. Solut. 7, 304. https://doi.org/10.1007/s41062-022-00908-7 (2022).

    Article 

    Google Scholar 

  • Dayal, S. Earned Value Management Using Microsoft Office Project, A Guide for Managing Any Size Project Effectively (J Ross Pub, 2008).

    Google Scholar 

  • Eber, W. Artificial intelligence in construction management—A perspective. In Proceedings of the Creative Construction Conference 2019, CCC 2019, 29 June–2 July 2019, Budapest, Hungary, 030, pp. 205–212. https://doi.org/10.3311/CCC2019-030 (2019).

  • Elshaer, R. Impact of sensitivity information on the prediction of project’s duration using earned schedule method. Int. J. Project Manag. 31, 579–588 (2013).

    Article 

    Google Scholar 

  • Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 5th Ed. (2013)

  • Naderpour, A. & Mofid, M. Improving construction management of an educational center by applying earned value technique. Procedia Eng. 14, 1945–1952 (2011).

    Article 

    Google Scholar 

  • Jaina, M. & Pathak, K. K. Applications of artificial neural network in construction engineering and management—A review. Int. J. Eng. Technol. Manag. Appl. Sci. 2(3), 134–142 (2014).

    Google Scholar 

  • Aju, D. E., Onyelowe, K. C. & Alaneme, G. U. Constrained vertex optimization and simulation of the unconfined compressive strength of geotextile reinforced soil for flexible pavement foundation construction. Clean. Eng. Technol. https://doi.org/10.1016/j.clet.2021.100287 (2021).

    Article 

    Google Scholar 

  • Attah, I. C., Etim, R. K., Alaneme, G. U. & Bassey, O. B. Optimization of mechanical properties of rice husk ash concrete using Scheffe’s theory. SN Appl. Sci. 2, 928. https://doi.org/10.1007/s42452-020-2727-y (2020).

    Article 
    CAS 

    Google Scholar 

  • Das, S. K., Samui, P. & Sabat, A. K. Application of artificial intelligence to maximum dry density and unconfined compressive strength of cement stabilized soil. Geotech. Geol. Eng. 29(3), 329–342 (2011).

    Article 

    Google Scholar 

  • Alaneme, G. U. et al. Modeling volume change properties of hydrated-lime activated rice husk ash (HARHA) modified soft soil for construction purposes by artificial neural network (ANN). Umudike J. Eng. Technol. 6(1), 88–110. https://doi.org/10.33922/j.ujet_v6i1_9 (2020).

    Article 

    Google Scholar 

  • Wang, X. Z., Duan, X. C. & Liu, J. Y. Application of neural network in the cost estimation of highway engineering. J. Comput. 5(11), 1762–1766 (2010).

    Article 

    Google Scholar 

  • Alaneme George, U. & Mbadike Elvis, M. optimization of flexural strength of palm nut fibre concrete using Scheffe’s theory. Mater. Sci. Energy Technol. 2(2019), 272–287. https://doi.org/10.1016/j.mset.2019.01.006 (2019).

    Article 

    Google Scholar 

  • Vanhoucke, M. & Vandevoorde, S. A simulation and evaluation of earned value metrics to forecast the project duration. J. Oper. Res. Soc. 58, 1361–1374 (2007).

    Article 
    MATH 

    Google Scholar 

  • El-Sawalhi, N., Eaton, D. & Rustom, R. Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Constr. Innov. 8(4), 280–298 (2008).

    Article 

    Google Scholar 

  • Shahmansouri, A. A., AkbarzadehBengar, H. & Jafari, A. Modeling the lateral behavior of concrete rocking walls using multi-objective neural network. J. Concrete Struct. Mater. 5(2), 110–128. https://doi.org/10.30478/jcsm.2021.272480.1192 (2020).

    Article 

    Google Scholar 

  • Shahmansouri, A. A., Yazdani, M., Hosseini, M., Bengar, H. A. & Ghatte, H. F. The prediction analysis of compressive strength and electrical resistivity of environmentally friendly concrete incorporating natural zeolite using artificial neural network. Constr. Build. Mater. 317, 125876. https://doi.org/10.1016/j.conbuildmat.2021.125876 (2022).

    Article 
    CAS 

    Google Scholar 

  • Chakraborty, D., Elhegazy, H., Elzarka, H. & Gutierrez, L. A novel construction cost prediction model using hybrid natural and light gradient boosting. Adv. Eng. Inform. https://doi.org/10.1016/j.aei.2020.101201 (2020).

    Article 

    Google Scholar 

  • Seker, A., Erol, S. & Botsali, R. A neuro-fuzzy model for a new hybrid integrated Process Planning and Scheduling system. Expert Syst. Appl. 40(13), 5341–5351. https://doi.org/10.1016/j.eswa.2013.03.043 (2013).

    Article 

    Google Scholar 

  • Afradi, A. & Ebrahimabadi, A. Comparison of artificial neural networks (ANN), support vector machine (SVM) and gene expression programming (GEP) approaches for predicting TBM penetration rate. SN Appl. Sci. 2, 2004. https://doi.org/10.1007/s42452-020-03767-y (2020).

    Article 

    Google Scholar 

  • Alaneme, G. U. et al. Mechanical strength optimization and simulation of cement kiln dust concrete using extreme vertex design method. Nanotechnol. Environ. Eng. 7(4), 467–490. https://doi.org/10.1007/s41204-021-00175-4 (2022).

  • Alaneme, G. U. & Mbadike, E. M. Optimisation of strength development of bentonite and palm bunch ash concrete using fuzzy logic. Int. J. Sustain. Eng. https://doi.org/10.1080/19397038.2021.1929549 (2021).

  • Iro, U. I. et al. Optimization and simulation of saw dust ash concrete using extreme vertex design method. Adv. Mater. Sci. Eng. 2022, 5082139. https://doi.org/10.1155/2022/5082139 (2022).

  • Razavi, R. et al. Application of ANFIS and LSSVM strategies for estimating thermal conductivity enhancement of metal and metal oxide based nanofluids. Eng. Appl. Comput. Fluid Mech. 13(1), 560–578 (2019).

    Google Scholar 

  • Zarei, F., Razavi, R., Baghban, A. & Mohammadi, A. H. Evolving generalized correlations based on Peng–Robinson equation of state for estimating dynamic viscosities of alkanes in supercritical region. J. Mol. Liq. 284, 755–764 (2019).

    Article 
    CAS 

    Google Scholar 



  • Source link

    Leave a Reply

    Your email address will not be published. Required fields are marked *